Please register to access this content.
To continue viewing the content you love, please sign in or create a new account
Dismiss
This content is for our paying subscribers only

UAE Transport

Dubai Metro moments in pictures

As the Dubai Metro turns 10, we look back at some of its milestones



The first Metro train winds its way down Sheikh Zayed Road. Dozens of motorists honked and scores of onlookers cheered as the train rolled out of the station.
Image Credit: Gulf News archives
May 29, 2005 | Qasim Sultan, then Director General of Dubai Muncipality, and Susumu Uchida, Board Member of Mitsubishi Heavy Industries, signing the Metro contract.
Image Credit: Gulf News archives
Sheikh Mohammed unveils a commemorative coin at DIFC station during the Dubai Metro's maiden journey.
Image Credit: Gulf News archives
August 6, 2006 | A worker who seems to have been caught in a web puts final touches to a foundation piling for a bridge in Al Awir.
Image Credit: Gulf News archives
A metro train makes a trial run on the red line on Sheikh Zayed Road. The metro, aimed at helping commuters reach strategic areas of the city and was to also branch out into the suburbs through future extensions. This project is ongoing.
Image Credit: Gulf News archives
Advertisement
March 13, 2007 | Contruction workers prepare the steel structure for piers for the elevated track at the site of a Metro station
Image Credit: Gulf News archives
March 2007 | The Metro's tracks take shape along Sheikh Zayed Road.
Image Credit: Gulf News archives
A worker gives the Dubai Metro's tracks a thorough wash as preparations for the opening of the Red line continue in full swing.
Image Credit: Gulf News archives
March 2008 | The tunnel-boring machine Al Wugeisha breaks through the wall.
Image Credit: Gulf News archives
Advertisement
April 25, 2008 | Trains are hoisted onto the tracks.
Image Credit: Gulf News archives
An official monitors the train's progress on the track. Dubai became the first Gulf state to have a metro and joined the league of mega cities around the world that have similar transport systems.
Image Credit: Gulf News archives
Construction of the 12.6-kilometre underground tracks was one of the most critical parts of the Dubai Metro project.
Image Credit: Gulf News archives
Workers are busy laying part of the track of the Dubai Metro. The Red Line extends 52km and comprises 29 stations (4 underground and 25 elevated).
Image Credit: Gulf News archives
Advertisement
Dubai Metro is the world's longest driverless automated railway system.
Image Credit: Gulf News archives
The Dubai Metro provides the backbone of public transport in the city.
Image Credit: Gulf News archives
A maintenance team is hard at work at the Al Rashidiya train maintenance depot
Image Credit: Gulf News archives
A view of the Dubai Metro control room at the RTA Operational Control Centre.
Image Credit: Gulf News archives
The work on the elevated track of Dubai Metro project has been completed.
Image Credit: Gulf News archives
Advertisement
The Metro system is to provide an alternative mode of transport to ease congestion, save passengers' travel time and reduce traffic pollution.
Image Credit: Gulf News archives
March 2008 | A view of the construction site of the elevated track of the red line Dubai Metro Network along Sheikh Zayed Road.
Image Credit: Gulf News archives
Since the launch of the service (on 9/9/2009) till the end of August 2017, the metro has lifted 1.028 billion riders (689 m riders lifted by the Red Line and 339 m riders served by the Green Line). This milestone concurs with RTA’s celebrations of the eighth anniversary of the Metro operation today (Saturday) amid huge success indicators in terms of operational efficiency and high security & safety levels.
Image Credit: RTA

Read more

November 2018 | The first of the new metro trains destined for #Route2020 has arrived at the Metro Depot at Rashidiya.
Image Credit: RTA
Advertisement

Read more

A Metro station on Route 2020, leading to the Expo 2020 venue, under construction at Discovery Gardens in Dubai.
Image Credit: Gulf News archives
One of the Dubai Metro stations under construction along Route 2020. Eighty per cent of rail work has been completed, while station works are 60 per cent complete.
Image Credit: RTA
An artist’s impression of the Expo 2020 site metro station, which is set to be the biggest and most eco-friendly in the Dubai Metro network.
Image Credit: WAM
Advertisement

read more

Advertisement