Building tunnel for Metro

Building tunnel for Metro

Last updated:
1 MIN READ

Dubai: Tunnel boring machines Al Wugeisha 1 and 2 have started operations for the metro railway, the Rail Agency of the Roads and Transport Authority announced.

Al Wugeisha 1 has started the main drive and Al Wugeisha 2 has begun its initial drive. Al Wugeisha 1 will tunnel from Union Square to BurJuman.

The machine is scheduled to reach BurJuman by early September, covering a length of 1.5 km.

Sign up for the Daily Briefing

Get the latest news and updates straight to your inbox