DEWA has completed 44 per cent of its pumped-storage hydroelectric power station being built by DEWA in Hatta, which will have a production capacity of 250 megawatts (MW), a storage capacity of 1,500 megawatt-hours and a life span of up to 80 years.
DEWA completes 44% of 250MW Hatta hydroelectric power plant
Sign up for the Daily Briefing
Get the latest news and updates straight to your inbox
Network Links
GN StoreDownload our app
© Al Nisr Publishing LLC 2025. All rights reserved.